    He doesn't plan to stay for that anyway so no point.
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    Internet went down then about 15 seconds later half the power went out. I say half because PC shut down, window AC in bedroom shut down...
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    Tried to post the link. Site didn't like that. So pitcher will work. But be two more weeks of getting rained in.
    • IMG_20250517_125249532.jpg
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    Had a "handyman/ex-roofer" finish the porch. You'd have to see it to believe it. Hasn't leaked but it's hackery at its worst. Porch is...
  • KTMLew01
    I can't figure it out. Every time I try to change apps, the garage door opens and closes. :blink:
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    Really tempted to go butcher some OSB except rain is pending...if I could get few 4 foot sections on lower part to "catch" the upper 8...
  • KTMLew01
    You have trouble with the Roku remote!:dual9mm::eek::dunce::biggrin:
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    I mean you could do the whole thing in 4 foot sections and probably be fine long as you offset them. Still requires climbing. Or a 12...
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    Everyone is MAGA here. MONEY! MONEY! MONEY! If you ain't paying big money they ain't interested. My money is small.
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    Hmmmm? 4 foot at lower rear, both sides. Ties structure together and leaves you room to handle upper. Then run all the upper section...
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    Voicemail. Be little surprised if get any response. If isn't a $5K or up job most don't want it. After some thought on sheathing...
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    Made the call. Gonna get estimate from a professional to finish this POS. There is no way, even with a large firearm, you could get me...
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    Calculating sheathing lengths to get some offset over 23 feet. Looks like 7+8+8 then maybe 3+8+4+8 gets peak section. Can cobble the...
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    When measuring have to get too close to looking over the end into the abyss. Me no like. A gusset here, some siding there, a pair in a...
  • KTMLew01
    KTMLew01 replied to the thread Storage building.
    Two more to go but sweat got in my eye boss. Not sure who's fault it is but they don't all stick out the same amount. Have learned you...