Storage building

O'Reilly's has AC gauge set rental with $264 deposit. With a vac pump just short of 500! All fully refundable tho. Think will buy a 75 dollar vac pump as need one to test transmission valve body. I'm tempted to go check with some ex-coworkers and see if can borrow a gauge set and vacuum pump. Right now need to see if it holds vacuum. If it does, "continue to assemble" is the old instructions. The low pressure switch was definitely leaking back couple months ago. It's entirely possible the new Advance Chinese part is leaking too. Let me go see if connector is wet?

Nope. It's dry. Need a black light to look for dye.
 
Just went to shed to get a funnel. Had to be well over 100 degrees. Have a box fan running but really need to increase the vent size & move the fan. Opened everything up to let air flow. Made huge difference in less than 5 minutes. Kinda like to put in couple windows.
 
Still somewhat dilated so will be quick. They found also had a small retinal tear. Doc asked if wanted to go ahead and have her weld it while was already numbed up. Sure! Today's the day. Then after allowing the weld (laser) to cool down for 20 or so minutes, mainly waiting to see if I spontaneously combusted I think, into the torture chamber for two needles in the eye. Crazy chit.

I DID, unofficially, get the good drugs. Because I saw the pool/bubble of stuff going in and floating around. The "sham treatment" would just be some pressure on the eye. I could definitely feel the needle and see the drug. Noice! Go back next Wed to make sure everything looks fine. Then 20th of next month and every 20th'ish for next 5 months.

Eye was pretty pizzed-off on way home. Not sure if the Betadine was the cause, the vise-grips on the eyelids or the torching but it was a bit sore. The torching definitely almost immediately helped left peripheral vision.

1779313443468.png
 
Back
Top Bottom