Got three lag bolts, 47 nails, two 2x4 pieces of OSB attached from shed to F&R vertical legs so she don't try to boogie down. Couple nails in each of the walk boards. Will nail other end once I get brave enough to get up thar. Attach the handy rail. Then after messing around all day, it'll rain.
At least now have a work surface. Have one more crooked 2x8 to extend the length. Will move one when needed. Then IF I get the underlayment on this side, have to move the whole thing to other side! Pretty likely will do underlayment AND shingles on one side THEN move this abomination.
Did i mention how much I hate & suck at this stuff?